Mechanical ventilation with heat recovery has become a familiar feature of the modern British home. In airtight new-builds, flat conversions and retrofit projects, an MVHR unit is often the only thing standing between a sealed envelope and genuinely stale air. It is designed, commissioned and documented against the requirements of Approved Document F, the occupier is handed a booklet, and then the cupboard door closes.
The difficulty is that an MVHR system has no obvious failure mode. A boiler locks out; a fan motor eventually seizes; an MVHR simply becomes less effective. Filters load, ducts sag, actuators stick and airflows drift downwards, and because the unit is still humming quietly in its cupboard, nobody suspects a problem. By the time an occupant notices that a bedroom feels stuffy or that condensation has appeared on a window in January, the system may have been running well below its design duty for two or three winters.
That is a maintenance problem, not a product problem. The five areas below account for a large share of the domestic MVHR faults we encounter, and none of them are difficult to address if they are looked at regularly.
Filters: the one check everyone remembers, and still gets wrong
Filter replacement is the routine task occupiers know about. Doing it correctly is another matter. Units are usually supplied with a coarse extract filter and a finer supply filter, and the grade matters: substituting a cheaper panel filter, or leaving a filter housing that does not seal properly, allows a proportion of dust and pollen to bypass filtration altogether and settle in the heat exchanger. A distorted or torn gasket defeats a perfectly good filter.
Two practical points. First, in urban areas, near new construction or in homes with pets, a six-month interval may be more appropriate than the annual norm. Second, spares should be stored in the dwelling and the replacement date written on the filter frame, because the check is only as reliable as the person who remembers to do it. A visibly grey filter is not evidence of effective filtration; it is evidence of a filter that has been doing its job for too long.
Condensate: the drain nobody inspects
Warm, moisture-laden extract air passes through the heat exchanger and gives up its water, which is collected in a tray and routed to a drain. That route is frequently the most neglected part of the installation. Traps silt up, flexible tails kink, falls are lost during later joinery work, and in flats the condensate often feeds a small lift pump that no one has heard operate in years.
A blocked condensate path can back up into the unit, spill into a ceiling void or, in cold weather, freeze in an unheated loft. None of these outcomes are dramatic at first, which is precisely why they go unreported until damage is done. Checking the trap, confirming the fall and clearing the drain takes minutes and should form part of any service visit.
Duct access: the decision that cannot be retrofitted
A great many systems are installed with no inspection access whatsoever beyond the two connections at the unit. Ductwork that has sagged, been crushed behind plasterboard or slipped off a spigot will still pass air, just not the quantity assumed at commissioning. Insulation on the cold supply side is a related weak point: where it is incomplete, the incoming air picks up heat in the loft or loses it in the void, and the recovery efficiency so carefully quoted in the design disappears.
Where access is impossible, the practical response is to measure at the terminals rather than assume. A ventilation system that cannot be inspected can still be tested.
Summer bypass: a function that seizes quietly
The automatic bypass is designed to admit cooler night air during the warmer months, and with overheating now a formal consideration under Part O, its correct operation carries more weight than it once did. It is also one of the most common silent failures, because nothing happens when it stops working. Actuators stick, linkages stiffen and frost protection sensors fail, leaving a damper that never opens. The house is simply a little warmer in July than it needs to be, and no one connects that to the ventilation unit in the loft.
A functional test in spring, before it matters, is far cheaper than an overheating investigation in August.
Rebalancing after alterations
Any change to a dwelling changes its pressure regime. A new kitchen extractor, an additional ensuite, a loft conversion, a replacement of a passive trickle vent with an intermittent fan: each will pull air through the dwelling differently, and extract-only fans in particular can reverse the flow through an MVHR supply terminal. The result is a system that is balanced on paper and unbalanced in reality.
Recommissioning after significant works is the only reliable remedy, and it is rarely included in the builder's scope unless it is asked for at the outset.
A regime that is proportionate
None of this requires an elaborate contract. A sensible regime looks like this: filters every six to twelve months depending on the setting; an annual service covering the heat exchanger, condensate path, actuators and fan condition; a functional check of the bypass each spring; airflow verification every few years or after building work; and a written record kept with the unit so that the next occupier inherits a history rather than a mystery. Where the property is a leasehold block with a central system, the responsible party should be named in the maintenance schedule rather than left ambiguous between landlord and managing agent.
MVHR is a sound technology and it is doing more work in UK homes than at any point in its history. It rewards attention in a way that other building services do not, because there is no warning light when performance falls away. Set and forget is not a maintenance strategy; it is a slow reduction in the air quality and energy performance the system was installed to deliver.